Published
4
Critical Issues
0
This Month
0
Total Views
4
Issues by Trade
Click "Analyse Trends" to get AI-powered insights on recurring issues by trade

Fire Door Compliance Failures Due to Settlement
QAB-2026-005
Recurring issues with fire door compliance discovered at the end of the Defect Liability Period (DLP) due to building movement and material instability.
Central Packers Missed During Pod Installations
QAB-2026-003
Central packers are frequently omitted during modular pod installations, leading to movement that causes grout cracking and significant water ingress risks.
Overloading of Roof Waterproofing Systems by Planters
QAB-2026-002
Planters on roof terraces are frequently filled entirely with soil, causing excessive weight that damages the waterproofing membrane and leads to localized settlement and leaks.
Water Ingress Through Uncontrolled Penetrations in Warm Roof Systems
QAB-2026-001
Uncontrolled penetrations by follow-on trades through completed waterproofing membranes cause water ingress, leading to saturated insulation and difficult-to-locate leaks.