Non-Conformance Reports
Track and resolve quality issues
202
Open NCRs
1
Critical
26
Major
161
Overdue
| NCR Number | Title | Project | Severity | Status | Due Date | |
|---|---|---|---|---|---|---|
P654-NCR-1 | Walls out of plumb — gaps exceed 3mm tolerance next to furniture - | Bristol Road, Birmingham | Minor | Open | - | |
P654-NCR-26 Building Internal > Block C > Level 14 | Level 14 concrete slab surface not suitable for flooring (Block C) - | Bristol Road, Birmingham | Minor | Closed | - | |
P634-NCR-324 Building Internal > Block B > Level 08 > B-08-10 | Door has not been installed as per drawing. Door should be 11mm up from FFL to allow (B-08-10) - | Water Lane | Minor | Closed | Apr 21, 2026 | |
P634-NCR-401 Building Internal > Block B > Level 25 | Pipework to letter boxes does not follow agreed set out as senT by S taylor HG . Please (Level 25) - | Water Lane | Minor | Open | Jun 30, 2026 | |
P634-NCR-402 Building Internal > Block B > Level 24 | Pipework is incorrect to letter boxes as per sketch sent out by S Taylor HG . Please (Level 24) - | Water Lane | Minor | Closed | Jun 30, 2026 | |
P634-NCR-403 Building Internal > Block A > Level 05 > A-05-12 | Wardrobe pattresses missing in both bedrooms on one side of wardrobe in each. This will (A-05-12) - | Water Lane | Minor | Open | Jun 30, 2026 | |
P634-NCR-404 Building Internal > Block A > Level 05 > A-05-17 | Wardrobe pattresses missing in bedroom on one side of wardrobe. This will require removal (A-05-17) - | Water Lane | Minor | Open | Jun 30, 2026 | |
P634-NCR-443 Building Internal > Block B > Level 23 > B-23-02 | Gaps around sockets behind kitchen drawer. Please advise on remedial detail (B-23-02) - | Water Lane | Minor | Open | Jul 30, 2026 | |
P634-NCR-444 Building Internal > Block B > Level 23 > B-23-04 | Gaps around sockets. Please provide remedial detail. (B-23-04) - | Water Lane | Minor | Open | Jul 30, 2026 | |
P634-NCR-445 Building Internal > Block B > Level 23 > B-23-05 | Wrong location cut out in ceiling to patch. (B-23-05) - | Water Lane | Minor | Closed | Jul 30, 2026 | |
P634-NCR-446 Building Internal > Block B > Level 22 > B-22-02 | Gaps around sockets please provide remediation detail (B-22-02) - | Water Lane | Minor | Open | Jul 30, 2026 | |
P634-NCR-447 Building Internal > Block B > Level 22 > B-22-02 | Wrong location hole in ceiling requires patching (B-22-02) - | Water Lane | Minor | Closed | - | |
P634-NCR-516 Building Internal > Block B > Level 22 > B-22-05 | Ceiling holes in wrong location to patch (B-22-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-518 Building Internal > Block B > Level 21 > B-21-02 | Gaps in sides of sockets. Please provide remediation detail for this (B-21-02) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-519 Building Internal > Block B > Level 21 > B-21-04 | Ceiling holes in wrong location to patch (B-21-04) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-520 Building Internal > Block B > Level 21 > B-21-04 | Gaps in sides of sockets. Please provide remediation detail for this (B-21-04) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-521 Building Internal > Block B > Level 21 > B-21-05 | Ceiling holes in wrong location to patch (B-21-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-522 Building Internal > Block B > Level 21 > B-21-05 | Gaps in sides of sockets. Please provide remediation detail for this (B-21-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-523 Building Internal > Block B > Level 20 > B-20-02 | Gaps in sides of sockets. Please provide remediation detail for this (B-20-02) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-524 Building Internal > Block B > Level 20 > B-20-03 | Ceiling holes in wrong location require patching (B-20-03) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-525 Building Internal > Block B > Level 20 > B-20-03 | Gaps in sides of sockets. Please provide remediation detail for this (B-20-03) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-526 Building Internal > Block B > Level 20 > B-20-04 | Hole in ceiling requires patching (B-20-04) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-527 Building Internal > Block B > Level 20 > B-20-04 | Paint peeling of walls to be redone. Due to painting over damp plaster not allowing (B-20-04) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-528 Building Internal > Block B > Level 20 > B-20-05 | Ceiling holes in the wrong location to patch (B-20-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-529 Building Internal > Block B > Level 20 > B-20-05 | Gaps in sides of sockets. Please provide remediation detail for this (B-20-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-530 Building Internal > Block B > Level 19 > B-19-02 | Ceiling holes in wrong location to patch (B-19-02) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-531 Building Internal > Block B > Level 19 > B-19-02 | Gaps in sockets. Please provide remedial detail for these (B-19-02) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-532 Building Internal > Block B > Level 19 > B-19-03 | Ceiling holes in wrong location to patch (B-19-03) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-533 Building Internal > Block B > Level 19 > B-19-04 | Gaps in sockets. Please provide remedial detail for these (B-19-04) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-534 Building Internal > Block B > Level 19 > B-19-05 | Ceiling holes in wrong location to be patched (B-19-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-535 Building Internal > Block B > Level 19 > B-19-05 | Gaps in sockets. Please provide remedial detail for these (B-19-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-536 Building Internal > Block B > Level 18 > B-18-02 | Ceiling holes in wrong location (B-18-02) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-537 Building Internal > Block B > Level 18 > B-18-02 | Gaps in sockets. Please provide remedial detail for these (B-18-02) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-538 Building Internal > Block B > Level 18 > B-18-03 | Ceiling holes in wrong location to patch (B-18-03) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-539 Building Internal > Block B > Level 18 > B-18-04 | Gaps in sockets. Please provide remedial detail for these (B-18-04) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-540 Building Internal > Block B > Level 18 > B-18-05 | Ceiling holes in wrong location (B-18-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-541 Building Internal > Block B > Level 18 > B-18-05 | Gaps in sockets. Please provide remedial detail for these (B-18-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-542 Building Internal > Block B > Level 17 > B-17-02 | Ceiling holes in wrong location to patch (B-17-02) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-543 Building Internal > Block B > Level 17 > B-17-02 | Gaps in sockets. Please provide remedial detail for these (B-17-02) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-545 Building Internal > Block B > Level 17 > B-17-03 | Ceiling holes in wrong location to patch (B-17-03) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-546 Building Internal > Block B > Level 17 > B-17-03 | Gaps in sockets. Please provide remedial detail for these (B-17-03) - | Water Lane | Minor | Open | - | |
P634-NCR-547 Building Internal > Block B > Level 17 > B-17-04 | Ceiling holes in wrong location to patch (B-17-04) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-548 Building Internal > Block B > Level 17 > B-17-04 | Gaps in sockets. Please provide remedial detail for these (B-17-04) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-549 Building Internal > Block B > Level 17 > B-17-05 | Gaps in sockets. Please provide remedial detail for these (B-17-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-550 Building Internal > Block B > Level 15 > B-15-02 | Gaps in sockets. Please provide remediation detail for this (B-15-02) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-551 Building Internal > Block B > Level 15 > B-15-04 | Ceiling holes in wrong location need patching (B-15-04) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-552 Building Internal > Block B > Level 15 > B-15-04 | Gaps in sockets. Please provide remediation detail for this (B-15-04) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-553 Building Internal > Block B > Level 15 > B-15-05 | Ceiling holes in wrong location need patching (B-15-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-554 Building Internal > Block B > Level 14 > B-14-02 | Gaps in sockets. Please provide remediation detail for this (B-14-02) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-555 Building Internal > Block B > Level 14 > B-14-04 | Gaps in sockets. Please provide remediation detail for this (B-14-04) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-556 Building Internal > Block B > Level 14 > B-14-04 | Ceiling holes in wrong location need patching (B-14-04) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-557 Building Internal > Block B > Level 14 > B-14-05 | Sprinkler hole requires patching (B-14-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-558 Building Internal > Block B > Level 14 > B-14-05 | Gaps in sockets. Please provide remediation detail for this (B-14-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-559 Building Internal > Block B > Level 13 > B-13-02 | Ceiling holes in wrong location need patching (B-13-02) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-560 Building Internal > Block B > Level 13 > B-13-02 | Gaps in sockets. Please provide remediation detail for this (B-13-02) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-561 Building Internal > Block B > Level 13 > B-13-04 | Gaps in sockets. Please provide remediation detail for this (B-13-04) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-562 Building Internal > Block B > Level 13 > B-13-05 | Ceiling holes in wrong location to patch (B-13-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-563 Building Internal > Block B > Level 13 > B-13-05 | Gaps in sockets. Please provide remediation detail for this (B-13-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-564 Building Internal > Block B > Level 13 > B-13-07 | Gaps in sockets. Please provide remediation detail for this (B-13-07) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-565 Building Internal > Block B > Level 13 > B-13-08 | Gaps in sockets. Please provide remediation detail for this (B-13-08) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-566 Building Internal > Block B > Level 12 > B-12-02 | Gaps in sockets. Please provide remediation detail for this (B-12-02) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-567 Building Internal > Block B > Level 12 > B-12-03 | Paint peeling off wall. Due to not allowing enough time for plaster to try before painting (B-12-03) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-568 Building Internal > Block B > Level 12 > B-12-04 | Non-conformance report (B-12-04) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-569 Building Internal > Block B > Level 12 > B-12-06 | Relocate socket behind kitchen draw (B-12-06) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-570 Building Internal > Block B > Level 12 > B-12-06 | Ceiling holes in wrong location to patch (B-12-06) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-571 Building Internal > Block B > Level 12 > B-12-07 | Non-conformance report (B-12-07) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-572 Building Internal > Block B > Level 12 > B-12-08 | Gaps in sockets. Please provide remediation detail for this (B-12-08) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-573 Building Internal > Block B > Level 11 > B-11-02 | Gaps in sockets. Please provide remediation detail for this (B-11-02) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-574 Building Internal > Block B > Level 11 > B-11-04 | Gaps in sockets. Please provide remediation detail for this (B-11-04) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-575 Building Internal > Block B > Level 11 > B-11-05 | Gaps in sockets. Please provide remediation detail for this (B-11-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-576 Building Internal > Block B > Level 11 > B-11-07 | Non-conformance report (B-11-07) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-577 Building Internal > Block B > Level 11 > B-11-08 | Ceiling holes in wrong location need patching (B-11-08) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-578 Building Internal > Block B > Level 11 > B-11-08 | Gaps in sockets. Please provide remediation detail for this (B-11-08) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-579 Building Internal > Block B > Level 10 > B-10-02 | Gaps in sockets. Please provide remediation detail for this (B-10-02) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-580 Building Internal > Block B > Level 10 > B-10-04 | Sprinkler holes to make good (B-10-04) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-581 Building Internal > Block B > Level 10 > B-10-04 | Gaps in sockets. Please provide remediation detail for this (B-10-04) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-582 Building Internal > Block B > Level 10 > B-10-05 | Fire alarm hole too big to make god (B-10-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-583 Building Internal > Block B > Level 10 > B-10-05 | Sprinkler holes require making good (B-10-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-584 Building Internal > Block B > Level 10 > B-10-05 | Gaps in sockets. Please provide remediation detail for this (B-10-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-585 Building Internal > Block B > Level 10 > B-10-06 | Oven sockets missing behind draw? Please check room 7 too same issue (B-10-06) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-586 Building Internal > Block B > Level 10 > B-10-06 | Gaps in sockets. Please provide remediation detail for this (B-10-06) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-588 Building Internal > Block B > Level 10 > B-10-08 | Ceiling holes in wrong location need patching (B-10-08) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-589 Building Internal > Block B > Level 09 > B-09-04 | Ceiling holes in wrong location to patch (B-09-04) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-592 Building Internal > Block B > Level 09 > B-09-07 | Ceiling holes in wrong location need patching (B-09-07) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-593 Building Internal > Block B > Level 09 > B-09-08 | Gaps around sockets. Please provide remediation detail for this (B-09-08) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-594 Building Internal > Block B > Level 09 > B-09-10 | Gaps around sockets. Please provide remediation detail for this (B-09-10) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-595 Building Internal > Block B > Level 09 > B-09-11 | Gaps around sockets. Please provide remediation detail for this (B-09-11) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-596 Building Internal > Block B > Level 09 > B-09-12 | Gaps around sockets. Please provide remediation detail for this (B-09-12) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-597 Building Internal > Block B > Level 08 > B-08-02 | Gaps around sockets. Please provide remediation provide remediation detail for this. (B-08-02) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-598 Building Internal > Block B > Level 08 > B-08-05 | Ceiling holes require patching (B-08-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-599 Building Internal > Block B > Level 08 > B-08-05 | Gaps around sockets. Please provide remediation provide remediation detail for this. (B-08-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-600 Building Internal > Block B > Level 08 > B-08-07 | Ceiling holes to patch (B-08-07) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-601 Building Internal > Block B > Level 08 > B-08-10 | Ceiling holes to be patched (B-08-10) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-602 Building Internal > Block B > Level 08 > B-08-11 | Holes in ceiling to patch (B-08-11) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-603 Building Internal > Block B > Level 08 > B-08-11 | Gaps around sockets. Please provide remediation provide remediation detail for this. (B-08-11) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-604 Building Internal > Block B > Level 08 > B-08-12 | Holes in ceiling to be patched (B-08-12) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-605 Building Internal > Block B > Level 07 > B-07-02 | Patch required above kitchen (B-07-02) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-606 Building Internal > Block B > Level 07 > B-07-04 | Gaps around sockets. Please provide remediation provide remediation detail for this. (B-07-04) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-607 Building Internal > Block B > Level 07 > B-07-05 | Patches above kitchen (B-07-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-608 Building Internal > Block B > Level 07 > B-07-06 | Holes in ceiling and above kitchen to patch (B-07-06) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-609 Building Internal > Block B > Level 07 > B-07-07 | Patch above kitchen (B-07-07) - | Water Lane | Minor | Open | - | |
P634-NCR-610 Building Internal > Block B > Level 07 > B-07-08 | Gaps around sockets. Please provide remediation provide remediation detail for this. (B-07-08) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-611 Building Internal > Block B > Level 07 > B-07-09 | Gaps around sockets. Please provide remediation provide remediation detail for this. (B-07-09) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-612 Building Internal > Block B > Level 07 > B-07-10 | Damage to ceiling around vent (B-07-10) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-613 Building Internal > Block B > Level 07 > B-07-11 | Ceiling holes to patch (B-07-11) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-614 Building Internal > Block B > Level 07 > B-07-12 | Gaps around sockets. Please provide remediation provide remediation detail for this. (B-07-12) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-615 Building Internal > Block B > Level 06 > B-06-02 | Hole to patch (B-06-02) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-616 Building Internal > Block B > Level 06 > B-06-03 | Gaps around sockets. Please provide remediation detail for this. (B-06-03) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-617 Building Internal > Block B > Level 06 > B-06-04 | Gaps around sockets. Please provide remediation detail for this. (B-06-04) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-618 Building Internal > Block B > Level 06 > B-06-05 | holes to patch (B-06-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-619 Building Internal > Block B > Level 06 > B-06-08 | Gaps around sockets. Please provide remediation detail for this. (B-06-08) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-620 Building Internal > Block B > Level 06 > B-06-10 | Holes to patch (B-06-10) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-621 Building Internal > Block B > Level 06 > B-06-12 | Gaps around sockets. Please provide remediation detail for this. (B-06-12) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-622 Building Internal > Block B > Level 05 > B-05-04 | Gaps around sockets. Please provide remediation detail for this. (B-05-04) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-623 Building Internal > Block B > Level 05 > B-05-08 | Ceiling holes to patch (B-05-08) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-624 Building Internal > Block B > Level 05 > B-05-09 | Ceiling holes to patch (B-05-09) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-625 Building Internal > Block B > Level 05 > B-05-10 | Ceiling holes to patch (B-05-10) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-626 Building Internal > Block B > Level 05 > B-05-10 | Gaps around sockets. Please provide remediation detail for this. (B-05-10) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-628 Building Internal > Block B > Level 05 > B-05-12 | Ceiling holes to patch (B-05-12) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-629 Building Internal > Block B > Level 04 > B-04-04 | Non-conformance report (B-04-04) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-630 Building Internal > Block B > Level 04 > B-04-08 | Gaps around sockets. Please provide remediation detail for this. (B-04-08) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-631 Building Internal > Block B > Level 04 > B-04-09 | Gaps around sockets. Please provide remediation detail for this. (B-04-09) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-632 Building Internal > Block B > Level 04 > B-04-10 | Patch (B-04-10) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-633 Building Internal > Block B > Level 04 > B-04-11 | Gaps around sockets. Please provide remediation detail for this. (B-04-11) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-634 Building Internal > Block B > Level 04 > B-04-12 | Ceiling holes to patch (B-04-12) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-635 Building Internal > Block B > Level 04 > B-04-12 | Gaps around sockets. Please provide remediation detail for this. (B-04-12) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-636 Building Internal > Block B > Level 03 > B-03-02 | Gaps around sockets. Please provide remediation detail for this (B-03-02) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-637 Building Internal > Block B > Level 02 > B-02-04 | Gaps around sockets. Please provide remediation detail for this (B-02-04) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-638 Building Internal > Block B > Level 03 > B-03-05 | Ceiling holes to be patched (B-03-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-639 Building Internal > Block B > Level 03 > B-03-08 | Gaps around sockets. Please provide remediation detail for this (B-03-08) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-640 Building Internal > Block B > Level 03 > B-03-10 | Gaps around sockets. Please provide remediation detail for this (B-03-10) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-641 Building Internal > Block B > Level 03 > B-03-11 | Patches required (B-03-11) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-642 Building Internal > Block B > Level 02 > B-02-04 | Gaps around sockets. Please provide remediation detail for this (B-02-04) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-643 Building Internal > Block B > Level 02 > B-02-05 | Ceiling holes to patch (B-02-05) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-644 Building Internal > Block B > Level 02 > B-02-06 | Patching required under sink (B-02-06) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-645 Building Internal > Block B > Level 02 > B-02-08 | Gaps around sockets. Please provide remediation detail for this (B-02-08) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-647 Building Internal > Block B > Level 02 > B-02-10 | Ceiling holes to patch (B-02-10) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-648 Building Internal > Block B > Level 02 > B-02-10 | Gaps around sockets. Please provide remediation detail for this (B-02-10) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-649 Building Internal > Block B > Level 02 > B-02-11 | Patching required under sink (B-02-11) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-650 Building Internal > Block B > Level 01 > B-01-09 | Ceiling holes to patch (B-01-09) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-651 Building Internal > Block B > Level 01 > B-01-09 | Gaps around sockets. Please provide remediation detail for this (B-01-09) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-652 Building Internal > Block B > Level 01 > B-01-09 | Patress missing for wall unit. Requires make good and kitchen fitter revisit to fit wall (B-01-09) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-653 Building Internal > Block B > Level 01 > B-01-10 | Gaps around sockets. Please provide remediation detail for this (B-01-10) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-654 Building Internal > Block B > Level 01 > B-01-13 | Sprinkler holes require patching (B-01-13) - | Water Lane | Minor | Open | Jul 31, 2026 | |
P634-NCR-655 Building Internal > Block B > Level 01 > B-01-13 | Gaps around sockets. Please provide remediation detail for this (B-01-13) - | Water Lane | Minor | Closed | Jul 31, 2026 | |
P634-NCR-656 Building Internal > Block A > Level 01 > A-01-02 | Flooring not level causing gap more than 3mm between floor and skirting. Will require (A-01-02) - | Water Lane | Minor | Open | Aug 31, 2026 | |
P634-NCR-657 Building Internal > Block A > Level 01 > A-01-03 | Flooring not level causing gap more than 3mm between floor and skirting. Will require (A-01-03) - | Water Lane | Minor | Open | Aug 31, 2026 | |
P634-NCR-042 Building External, Block A, North Elevation, Zone 1, GF RHS from external | Glazed brick pillar not built to correct standard — Block A, North Elevation - | Water Lane | Major | Open | Dec 19, 2025 | |
P634-NCR-397 Block B, Level 07, B-07-12 | Kitchen socket too close to hob — minimum 100mm clearance not maintained (B-07-12) - | Water Lane | Minor | Open | May 31, 2026 | |
P634-NCR-12482 Block A, Level 06, A-06-08, Party walls | Socket setting out — incorrect positions on party walls, kitchen install blocked (A-06-08) - | Water Lane | Minor | Open | May 8, 2026 | |
P634-NCR-336 Building External, Block A, South Elevation, L1–L5, W26 & W27 | Windows on south elevation do not align vertically — Block A, L1–L5 (W26 & W27) - | Water Lane | Major | Open | May 8, 2026 | |
P634-NCR-043 Building Internal, Ground Floor, Block A and Block B | Blockwork not up to standard — snags incomplete, blocks to replace - | Water Lane | Major | Open | Jan 16, 2026 | |
P634-NCR-348 Block A, Level 04, A-04-10 | Door installation issues — POD confirmed out of plumb on investigation (A-04-10) - | Water Lane | Minor | Closed | May 11, 2026 | |
P634-NCR-398 Block B, Level 07, B-07-12 | Missing patress behind wall — kitchen units cannot be fitted - | Water Lane | Minor | Closed | May 31, 2026 | |
P634-NCR-332 Building External, Block A, L3+L4, W1 & W56 | Windows do not align vertically — L3 to L4, Block A (W1 + W56) - | Water Lane | Major | Open | Apr 29, 2026 | |
P634-NCR-10616 Block B, Level 03, B-03-08 | Kitchen patresses missing — wall units cannot be fitted (B-03-08) - | Water Lane | Minor | Open | Mar 12, 2026 | |
P634-NCR-396 Block A, Level 08, A-08-01 | Kitchen socket locations incorrect — remedial patching required (A-08-01) - | Water Lane | Minor | Open | May 31, 2026 | |
P634-NCR-347 Block B, Level 16, B-16-03, Kitchen walls | Sockets cut out in wrong location — full tested detail repair required (B-16-03) - | Water Lane | Minor | Closed | May 11, 2026 | |
P634-NCR-356 | Non Conformance Report #356 - | Water Lane | Major | Open | May 11, 2026 | |
P634-NCR-343 | Non Conformance #343 - | Water Lane | Minor | Closed | May 11, 2026 | |
P634-NCR-359 | Non Conformance Report #359 - | Water Lane | Major | Open | May 11, 2026 | |
P634-NCR-353 | Non Conformance Report #353 - | Water Lane | Major | Closed | May 11, 2026 | |
P634-NCR-333 | Non Conformance Report #333 - | Water Lane | Minor | Open | - | |
P634-NCR-325 | Non Conformance Report #325 - | Water Lane | Minor | Open | - | |
P634-NCR-366 | Non Conformance Report #366 - | Water Lane | Minor | Open | - | |
P634-NCR-354 | Non Conformance Report #354 - | Water Lane | Major | Closed | May 11, 2026 | |
P634-NCR-342 | Non Conformance #342 - | Water Lane | Minor | Open | May 11, 2026 | |
P634-NCR-350 | Non Conformance #350 - | Water Lane | Major | Open | May 11, 2026 | |
P634-NCR-281 | Non Conformance Report #281 - | Water Lane | Minor | Closed | - | |
P634-NCR-345 | Non Conformance Report #345 - | Water Lane | Major | Open | May 11, 2026 | |
P634-NCR-337 | Non Conformance Report #337 - | Water Lane | Minor | Open | - | |
P634-NCR-357 | Non Conformance Report #357 - | Water Lane | Major | Closed | May 11, 2026 | |
P634-NCR-346 | Non Conformance #346 - | Water Lane | Major | Open | May 11, 2026 | |
P634-NCR-276 | Non Conformance Report #276 - | Water Lane | Minor | Closed | Mar 18, 2026 | |
P634-NCR-340 | Non Conformance Report #340 - | Water Lane | Minor | Open | - | |
P634-NCR-320 | Non Conformance Report #320 - | Water Lane | Minor | Open | - | |
P634-NCR-365 | Non Conformance Report #365 - | Water Lane | Minor | Open | - | |
P634-NCR-351 | Non Conformance #351 - | Water Lane | Major | Open | May 11, 2026 | |
P634-NCR-344 | Non Conformance Report #344 - | Water Lane | Major | Open | May 11, 2026 | |
P634-NCR-358 | Non Conformance Report #358 - | Water Lane | Major | Open | May 11, 2026 | |
P634-NCR-309 | Non Conformance Report #309 - | Water Lane | Minor | Open | - | |
P634-NCR-355 | Non Conformance Report #355 - | Water Lane | Major | Closed | May 11, 2026 | |
P634-NCR-349 | Non Conformance Report #349 - | Water Lane | Major | Open | May 11, 2026 | |
P634-NCR-289 | Non Conformance Report #289 - | Water Lane | Minor | Open | - | |
P634-NCR-364 | Non Conformance Report #364 - | Water Lane | Minor | Open | - | |
P634-NCR-352 | Non Conformance Report #352 - | Water Lane | Major | Open | May 29, 2026 | |
P634-NCR-208 | Client Snags #208 - | Water Lane | Minor | Closed | Mar 13, 2026 | |
P634-NCR-288 | Non Conformance Report #288 - | Water Lane | Minor | Closed | - | |
P634-NCR-280 | Non Conformance Report #280 - | Water Lane | Minor | Closed | - | |
P634-NCR-329 | Non Conformance Report #329 - | Water Lane | Minor | Open | - | |
P634-NCR-382 | Non Conformance Report #382 - | Water Lane | Minor | Open | - | |
P634-NCR-379 | Non Conformance Report #379 - | Water Lane | Minor | Open | - | |
P634-NCR-371 | Non Conformance Report #371 - | Water Lane | Minor | Open | - | |
P634-NCR-370 | Non Conformance Report #370 - | Water Lane | Minor | Open | - | |
P634-NCR-369 | Non Conformance Report #369 - | Water Lane | Minor | Open | - | |
P634-NCR-393 | Non Conformance Report #393 - | Water Lane | Minor | Open | May 29, 2026 | |
P634-NCR-375 | Non Conformance Report #375 - | Water Lane | Minor | Open | - | |
P634-NCR-374 | Non Conformance Report #374 - | Water Lane | Minor | Open | - | |
P634-NCR-387 | Non Conformance Report #387 - | Water Lane | Minor | Open | - | |
P634-NCR-376 | Non Conformance Report #376 - | Water Lane | Minor | Open | - | |
P634-NCR-389 | Non Conformance Report #389 - | Water Lane | Minor | Open | May 22, 2026 | |
P634-NCR-386 | Non Conformance Report #386 - | Water Lane | Minor | Open | - | |
P634-NCR-373 | Non Conformance Report #373 - | Water Lane | Minor | Open | - | |
P634-NCR-367 | Non Conformance Report #367 - | Water Lane | Minor | Open | - | |
P634-NCR-394 | Non Conformance Report #394 - | Water Lane | Minor | Open | May 29, 2026 | |
P634-NCR-388 | Non Conformance Report #388 - | Water Lane | Minor | Open | - | |
P634-NCR-380 | Non Conformance Report #380 - | Water Lane | Minor | Open | - | |
P634-NCR-377 | Non Conformance Report #377 - | Water Lane | Minor | Open | - | |
P634-NCR-372 | Non Conformance Report #372 - | Water Lane | Minor | Open | - | |
P634-NCR-378 | Non Conformance Report #378 - | Water Lane | Minor | Open | - | |
P634-NCR-384 | Non Conformance Report #384 - | Water Lane | Minor | Open | May 29, 2026 | |
P634-NCR-383 | Non Conformance Report #383 - | Water Lane | Minor | Open | - | |
P634-NCR-390 | Non Conformance Report #390 - | Water Lane | Minor | Open | May 22, 2026 | |
P634-NCR-385 | Non Conformance Report #385 - | Water Lane | Minor | Open | - | |
P634-NCR-368 | Non Conformance Report #368 - | Water Lane | Minor | Open | - | |
P634-NCR-12484 | Copied from May 8, 2026 — Socket setting out - | Water Lane | Minor | Closed | May 8, 2026 | |
P634-NCR-12257 | Missing cavity barriers - | Water Lane | Major | Open | May 11, 2026 | |
P634-NCR-12494 | Non Conformance Report — Electrical works - | Water Lane | Minor | Open | May 12, 2026 | |
P634-NCR-12493 | Non Conformance Report — Electrical works - | Water Lane | Minor | Open | May 12, 2026 | |
P634-NCR-10924 | Service holes in PUC room too big / unable to fire-stop - | Water Lane | Major | Open | Mar 24, 2026 | |
P634-NCR-10692 | Poor workmanship on kitchen socket cutouts - | Water Lane | Minor | Open | Mar 19, 2026 | |
P634-NCR-10693 | Poor workmanship on kitchen socket cutouts - | Water Lane | Minor | Open | Mar 19, 2026 | |
P634-NCR-10694 | Poor workmanship on kitchen socket cutouts - | Water Lane | Minor | Open | Mar 19, 2026 | |
P634-NCR-10695 | Poor workmanship on kitchen socket cutouts - | Water Lane | Minor | Open | Mar 19, 2026 | |
P634-NCR-10696 | Poor workmanship on kitchen socket cutouts - | Water Lane | Minor | Open | Mar 19, 2026 | |
P634-NCR-10697 | Poor workmanship on kitchen socket cutouts - | Water Lane | Minor | Open | Mar 19, 2026 | |
P634-NCR-10698 | Poor workmanship on kitchen socket cutouts - | Water Lane | Minor | Open | Mar 19, 2026 | |
P634-NCR-10699 | Poor workmanship on kitchen socket cutouts - | Water Lane | Minor | Open | Mar 19, 2026 | |
P634-NCR-10700 | Poor workmanship on kitchen socket cutouts - | Water Lane | Minor | Open | Mar 19, 2026 | |
P634-NCR-10702 | Poor workmanship on kitchen socket cutouts - | Water Lane | Minor | Open | Mar 19, 2026 | |
P634-NCR-10703 | Poor workmanship to socket cutouts - | Water Lane | Minor | Open | Mar 19, 2026 | |
P634-NCR-10704 | Poor workmanship to socket cutouts - | Water Lane | Minor | Open | Mar 19, 2026 | |
P634-NCR-10705 | Poor workmanship to socket cutouts - | Water Lane | Minor | Open | Mar 19, 2026 | |
P634-NCR-7943 | Socket setting out — incorrect positioning - | Water Lane | Minor | Open | Jan 16, 2026 | |
P634-NCR-7772 | Holes through firewalls not compliant - | Water Lane | Major | Open | Jan 12, 2026 | |
P634-NCR-7766 | Service holes in PUC room too big / unable to fire-stop - | Water Lane | Major | Open | Jan 9, 2026 | |
P634-NCR-3558 | Incorrectly installed drainage pipework - | Water Lane | Major | Closed | Sep 29, 2025 | |
NCR-P654-5798 | Sockets installed in wrong locations requiring remedial works to fire walls - | Bristol Road, Birmingham | Major | Open | - | |
NCR-P654-5799 | Pipework cutouts for kitchens using 200mm holes — oversized - | Bristol Road, Birmingham | Major | Open | - | |
NCR-P654-4012 | NCR 12 - Brickwork Out of Tolerance — Multiple Elevations - | Bristol Road, Birmingham | Major | Open | - | |
NCR-P654-2754 | Damaged Hilti fire collars - | Bristol Road, Birmingham | Major | Open | - | |
NCR-P654-2024 | NCR 14 - Cast-in channel issues affecting masonry support bracket seating - | Bristol Road, Birmingham | Major | Investigation | - | |
NCR-P654-1273 | NCR 10 - Level 2 Incorrectly Formed SFS Compound Studs - | Bristol Road, Birmingham | Major | Open | - | |
NCR-P654-1168 | EPDM adhesive application thickness issue impacting masonry support — additional locations - | Bristol Road, Birmingham | Major | Closed | - | |
NCR-P654-1129 | EPDM adhesive application thickness issue impacting masonry support bracket seating - | Bristol Road, Birmingham | Major | Closed | - | |
NCR-P654-177 | Level 2 columns out of tolerance affecting room sizes - | Bristol Road, Birmingham | Critical | Open | - | |
NCR-P654-169 | Level 1 columns out of position by more than 15mm - | Bristol Road, Birmingham | Critical | Closed | - | |
NCR-P654-155 | Concrete wall butt end to left hand side of riser 3 entrance is out of tolerance - | Bristol Road, Birmingham | Major | Closed | - | |
NCR-P654-121 | NCR 09 - Level 1 Incorrectly Formed SFS Compound Studs - | Bristol Road, Birmingham | Major | Closed | - | |
NCR-P654-49 | External brickwork toe tolerance issues - | Bristol Road, Birmingham | Major | Closed | - | |
NCR-P654-47 | NCR 01 - Level 5 Slab Level Tolerance Issues - | Bristol Road, Birmingham | Major | Closed | - | |
NCR-P654-45 | NCR 05 - Level 3 Slab Level Tolerance Issues - | Bristol Road, Birmingham | Major | Closed | - | |
NCR-P654-44 | NCR 04 - Level 2 Slab Level Tolerance Issue - | Bristol Road, Birmingham | Major | Closed | - | |
NCR-P654-42 | NCR 02 - Ground Floor Slab Level Tolerance - | Bristol Road, Birmingham | Major | Closed | - | |
NCR-P654-43 | NCR 03 - Level 1 Slab Level Tolerance Issue - | Bristol Road, Birmingham | Major | Closed | - | |
NCR-P654-41 | NCR 01 - Level 1 slab edge out of tolerance - | Bristol Road, Birmingham | Major | Closed | - | |
NCR-P654-46 | NCR 06 - Level 4 Slab Level Tolerance Issues - | Bristol Road, Birmingham | Major | Closed | - | |
NCR-2026-0003 Ground Level | Pile #177 - Pile Cage not going in Foundation Piling | Nine Elms, Battersea | Major | Open | Mar 27, 2026 | |
NCR-2026-0002 Ground Level | Pile #169 - Pile Cage Bent Before Inserting Foundation Piling | Nine Elms, Battersea | Minor | Open | Mar 24, 2026 | |
NCR-2026-0001 Ground Floor | Pile #23 - Non-Compliant Concrete HG Construction | Nine Elms, Battersea | Major | Open | Jan 13, 2026 |